Less invasive methods, full 3D coverage

Screen mining sites without disrupting operations.

GroundIQ accelerates screening ground conditions for mining infrastructure: pit, plant and tailings dam. See page pathways, weak zones and foundation variability appear in one 3D model, built with less invasive methods that suit remote sites. Sensors are placed by hand, so the mine keeps running throughout.

Talk to an expert

Three decisions GroundIQ changes on a live mine

The assets that most need ground evidence are the hardest to get it from: remote,without rig access, and in the case of a dam, hard to drill without questioning its integrity. Node-based acquisition removes that constraint, hand-carried across the whole asset with nothing intrusive. The three use-cases below show where it pays off.

Tailings dam screening

See inside the dam without drilling into it. See page pathways, weak zones and variability imaged safely on a live, operating asset.

Services

Asses
Assess pit, plant and dam from existing data and archives
Screen
Deploy passive sensors across the asset with zero operational disruption

Mining infrastructure design and engineering

Get a solid understanding of ground risk ahead of engineering new mining facilities.

Services

Assess
Reuse existing data to validate suitability fast, before collecting new on-site data
Validate
Take stability and layout decisions on validated reports and data

Mine closures

Get evidence on the ground before you sign off closure. Stability, water pathways and material conditions mapped in 3D across the whole site.

Services

Screen
Map stability, water pathways and material conditions across the whole site
Validate
Confirm the model where closure liability sits highest
CASE STUDY

Trusted by infrastructure and geotechnical teams

How GroundIQ helped Codelco rule out hidden structural risks in a Tailings Deposit in Chile

Seeing inside a tailings dam for Codelco at El Teniente, Chile. GroundIQ imaged thefull structure without drilling into it, on a live asset, and found no weakzones: a result the engineer of record could take into the dam safety review as evidence rather than inference.

4 weeks
To a full 3D model of the structure
1.200 m
Of dam imaged in one campaign
100 m+
Imaging depth, no drilling into the dam
Trusted by